Asset Integrity Solutions

Operators in the oil & gas industry are confronted with more and more challenges. The economic situation is tense, asset age and regulation impose stricter requirements. An optimized Integrity Management Process is recognized as the best way to meet these challenges. DTP offers cost effective state-of-the-art solutions in our portfolio. 

The environment and the market today require the highest levels of competency, expertise and knowledge to reach the right integrity solutions. DTP defines the best processes, procedures and tools based on best practices aligned with latest international standards. 

Remediation & Geotechnical Services

DTP provides specialized Remediation & Geotechnical Services to protect pipelines from environmental hazards and reduce risks.

DIG
Repairs

DTP offers comprehensive pipeline repair solutions, including excavation and coating system repairs.

Mechanical
Protection

DTP specializes in providing mechanical protection for pipelines, primarily using HDPE plates to reduce leaks and ruptures from mechanical damage

Our Portfolio

At DTP, you will find the advantages of having highly skilled personnel, whether you require an engineering assessment or a large-scale integrity remediation project implementation such as:

  • DIG repairs: Excavation, Coating system and Pipeline repairs.

  • Weather and Outside Forces (WOF): Remediations and Geotechnical repairs.

  • Mechanical Protection for Third Party Damage and/or Class location changes.

Client Project Descripción NPS Year
TransCanada (TC Energy)
Remediation Armeria river
Construction of gabions to reduce the river flow
30
2016
TransCanada (TC Energy)
Welding Inspection
CitroFrut / Atmospheric corrosion, repair and coating
16
2016
TransCanada (TC Energy)
Remediation
Pipeline protection works. Repair, Coating and gabions installation. Tamazunchale, San Luis Potosi
30
2017
TransCanada (TC Energy)
Remediation Armeria
Construction of gabions to reduce the river flow, in addition to repairing, painting, sandblasting of the uncovered sections of the pipeline, and all measures to ensure the safety of the pipeline.
30
2018
TransCanada (TC Energy)
Temporary Remediation of the Armería River
Temporary Remediation of the Armeria River - Manzanillo - Guadalajara Gas Pipeline. Mitigation Project.
30
2019
TransCanada (TC Energy)
Mechanical protection/Class Change
Installation of HDPE slabs as mechanical protection in addition of cleaning, sandblasting, repair, coating and rockshield as additional protection.
30
2020
TransCanada (TC Energy)
Remediation KP 248+215
Cleaning, sandblasting, inspection, repair, coating and rockshield installation. El Encino-Topolobampo pipeline
30
2020
TransCanada (TC Energy)
Remediation of KP 216+500
Cleaning, sandblasting, repair, coating and rockshield of uncovered sections of the pipeline, Manzanillo
30
2020
TransCanada (TC Energy)
Remediation KP 37
Temporary remediation at the crossing of the Manzanillo - Guadalajara gas pipeline with the Armería river at KP 37.
30
2020
TransCanada (TC Energy)
Mechanical Protection/ Class Change
Installation of HDPE Slabs as mechanical protection Gas Pipeline / Oro Mazatlán
26
2021
TransCanada (TC Energy)
Remediation KP 24+027, KP 42+227 and KP 130+234
Cleaning, sandblasting, inspection, repair, coating and rockshield Installation. El Encino-Topolobampo pipeline.
26
2021
TransCanada (TC Energy)
Mechanical Protection / Class Change
Installation of HDPE Slabs as mechanical protection Manzanillo Pipeline.
30
2021
TransCanada (TC Energy)
Remediation, KP 47+400
Cleaning, sandblasting, inspection, repair, coating and rockshield installation. Tamazunchale pipeline
26
2021
TransCanada (TC Energy)
Remediation KP 216+500
Remediation of the Manzanillo - Guadalajara gas pipeline Cleaning, sandblasting, inspection, repair, coating and rockshield installation. Recapped and protected with gabions.
30
2022
TransCanada (TC Energy)
Permanent remediation with geotechnical works KP 208+175
Cleaning, sandblasting, inspection, repair, coating and rockshield Installation. Geotechnical works with gabions in the Tamazunchale Gas Pipeline Extension.
36
2022
TransCanada (TC Energy)
Mechanical Protection/ Class Change / Pipeline Integrity / Permanent Remediation/installation of Slabs (Length 966 mts). KP 363+500
Installation of HDPE slabs as mechanical protection in addition of cleaning, sandblasting, repair, coating and rockshield as additional protection, Mazatlan pipeline.
30
2022
TransCanada (TC Energy)
Mechanical Protection/Class Change / Pipeline Integrity / Permanent Remediation/Installation of Slabs (Length 371 mtr), TM2X (TGHN) KP 112+250 (Cardonal) Hidalgo
Installation of HDPE slabs as mechanical protection in addition to cleaning, sandblasting, repair, coating and rockshield as additional protection
36
2022
TransCanada (TC Energy)
Remediation KP 122+430, and KP 122+921
Cleaning, sandblasting, repair, coating and rockshield as additional protection, Ixmiquilpan, Tamazunchale-El Sauz gas pipeline.
36
2022
TransCanada (TC Energy)
Mechanical Protection/ Class Change / Pipeline Integrity / Permanent Remediation
Installation of HDPE slabs as mechanical protection in addition to cleaning, sandblasting, repair, coating and rockshield as additional protection, Tamazunchale Pipeline.
26
2023
TransCanada (TC Energy)
Mechanical Protection/ Class Change / Pipeline Integrity / Permanent Remediation.
Installation of HDPE slabs as mechanical protection in addition to cleaning, sandblasting, repair, coating and rockshield as additional protection, Mazatlan pipeline.
30
2023
TransCanada (TC Energy)
Mechanical Protection/ Class Change / Pipeline Integrity / Permanent Remediation.
Installation of HDPE slabs as mechanical protection in addition to cleaning, sandblasting, repair, coating and rockshield as additional protection, Guadalajara pipeline.
30
2023
TransCanada (TC Energy)
Remediation KP 285+520
Cleaning, sandblasting, repair, coating and rockshield as additional protection, Guadalajara-Manzanillo Gas Pipeline, said point is located in the Municipality of Ixtlahuacán de los Membrillos, Jalisco.
30
2023
TransCanada (TC Energy)
Remediation KP 63+168
Horizontal and vertical erosion in the Tuxpan - Tula (TXL) gas pipeline, Cleaning, sandblasting, inspection, repair, coating and rockshield installation.
36
2023
TransCanada (TC Energy)
Mechanical Protection/Class Change / Pipeline Integrity / Permanent Remediation, KP 178+234
Installation of HDPE slabs as mechanical protection in addition to cleaning, sandblasting, repair, coating and rockshield as additional protection, Tamazunchale Pipeline
36
2023
TransCanada (TC Energy)
Permanent Remediation, KP 32+910, KP 324+952, Rio Tanquian
Geotechnical works with gabions, Tamazunchale Pipeline
36
2023